We recently reviewed the 2024 Ertiga with a 400 km ride review with all the details and facts, then the car is due for the first service as we rode the car for a few road trips.
Maruti Suzuki service experience
We took the car into the service area immediately. The executive arrived at the car with a question of how he could help us then we said we had come for the first service of this Ertiga, so he immediately went inside and bought a paper and asking details about the car like chassis number, km driven, and any problem you have faced in the first 1000 km. He immediately gave us the service estimate paper and told us the time that I will take like 3 hours.
First service cost
The first service cost us Just Rs – 90, so here is the breakdown
- The first service is a free service from Maruti Suzuki which means no labour charge will be charged.
- Two things they have used
- Distilled water – Rs – 43.74
- Screen Wash 50 costs Rs – 28.80
- Total tax added with CGST and SGST included Rs – 17.42
- The total first service cost charged is Rs – 90 which is extremely super affordable in a maintenance point of view
The second service will be at 5000 km and it is also a free service he said it will also cost roughly Rs – 500 where it will be wheel balancing and alignment with standard checkpoints followed by a service centre.
In the third servicing engine oil and other consumables will be changed at 10,000 km or 1 year whichever is earlier and from then on every service is at an interval of 10,000 km.

Comprehensive Service package for 2 years
29/06/26 or 20000 km | Offered Qty | Amount |
---|---|---|
WHEEL BALANCING – 5 WHEEL | 1.00 | |
WHEEL ALIGNMENT | 1.00 | |
VEHICLE WASHING & CLEANING | 1.00 | |
PICK-UP & DROP CHARGES | 1.00 | |
MOS CHARGES-NIGHT SHIFT | 4.00 | |
MOS CHARGES FOC-DAY SHIFT | 1.00 | |
PMS-2P 20K/40K/60K/80K | 2.00 | |
GASKET | 2.00 | |
FILTER ASSY, OIL | 1.41 | |
COOLANT (AB) NON AMINE | 1.00 | |
BRAKE FLUID GC1500AA (500 ML PACK) | 6.60 | |
ECSTAR NEXA 0W16-IDEMITSU | ||
Labour Details | 3,748.70 | |
Part Details | 340.00 | |
Consumable Details | 3,939.85 | |
Sub Total Amount | 8,028.55 | |
Less Discount | 1,193.80 | |
Net Bill Amount (Rounded) | 7,367.00 | |
Taxes | ||
SGST @ 9% | 266.33 | |
CGST @ 9% | 266.33 | |
Total Taxes | 532.66 | |
Total (including taxes) | 7,899.66 | |
MCP valid until | 29/06/26 or 20000 kms |
Note: The table assumes some values that were not explicitly provided. Adjustments might be needed based on exact charges for each service and item.